Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


whats diffeence between dcs & scada operation.

Answers were Sorted based on User's Feedback



whats diffeence between dcs & scada operation...

Answer / ankit

by dcs u control all parameter of the field on distributed
level and scada means it supervise and control the whole
plant parameter on central level.the dcs and scada full
name given states
dcs : distributed control system
scada : supervisory control and data acquisition

Is This Answer Correct ?    29 Yes 4 No

whats diffeence between dcs & scada operation...

Answer / nagarajan singapore

DCS is nothing but distributed control system which is
controlling all parameter by distributing data to separate
unit from the master data base along with the field
bus .this is indeppedent control system.

SCADA is supervisory control and data acquistion system
which is monitor based control from plc i/o .this one
deppendent control control system by controlling a limited
control

Is This Answer Correct ?    17 Yes 0 No

whats diffeence between dcs & scada operation...

Answer / likhit

The goals of DCS and SCADA are quite different. It is possible for a single system to be capable of performing both DCS and SCADA functions, but few have been designed with this in mind, and therefore they usually fall short somewhere. It has become common for DCS vendors to think they can do SCADA because the system specifications seem so similar, but a few requirements paragraphs about data availability and update processing separates a viable SCADA system from one that would work OK if it weren't for the real world getting in the way.

DCS is process oriented: it looks at the controlled process (the chemical plant or whatever) as the centre of the universe, and it presents data to operators as part of its job. SCADA is data-gathering oriented: the control centre and operators are the centre of its universe. The remote equipment is merely there to collect the data--though it may also do some very complex process control!

A DCS operator station is normally intimately connected with its I/O (through local wiring, FieldBus, networks, etc.). When the DCS operator wants to see information he usually makes a request directly to the field I/O and gets a response. Field events can directly interrupt the system and advise the operator.

SCADA must operate reasonably when field communications have failed. The 'quality' of the data shown to the operator is an important facet of SCADA system operation. SCADA systems often provide special 'event' processing mechanisms to handle conditions that occur between data acquisition periods.

There are many other differences, but they tend to involve a lot of detail. The underlying points are:

SCADA needs to get secure data and control over a potentially slow, unreliable communications medium, and needs to maintain a database of 'last known good values' for prompt operator display. It frequently needs to do event processing and data quality validation. Redundancy is usually handled in a distributed manner.

DCS is always connected to its data source, so it does not need to maintain a database of 'current values'. Redundancy is usually handled by parallel equipment, not by diffusion of information around a distributed database.

These underlying differences prompt a series of design decisions that require a great deal more complexity in a SCADA system database and data-gathering system than is usually found in DCS. DCS systems typically have correspondingly more complexity in their process-control functionality.

The company I work for has both DCS and SCADA products. The operator stations for each product line can use the same UNIX workstations. The systems share data (and thus form a composite SCADA/DCS system), but the SCADA database architecture is significantly different from the DCS data architecture, to the extent that the SCADA master station database looks to the DCS operators very much like some directly-connected DCS I/O. The DCS people are (of course) keen to simplify this to cut costs. However, they do not yet have a viable alternative for the mechanisms required in SCADA systems to have communications redundancy and data redundancy to provide the sort of SCADA system reliability that our customers expect.

If you look at most customer's system requirements specifications, a careful analysis of the data collection and data quality requirements will indicate if SCADA-style or DCS-style systems are appropriate. In general: the more features a system provides the more it will cost, so if you do not need SCADA-type data gathering facilities it will usually be more economical to use a DCS-type system. If you do need these facilities, you will pay for them.

The short answer: DCS and SCADA are still different things, it depends what the customer specifies as to which is appropriate for a particular installation.

I hope this has clarified more than it has confused. Also, it is my opinion based on my own experiences with DCS and SCADA. Others may have experience with systems that are designed to provide full SCADA and full DCS functionality in the one system.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

HELLO FRENDS ,, I M IN THE MIDST OF TROUBLE .. JUST LITTLE HELP ME... SUPPOSE ,, I HAVE A CLOSE VESSELE TANK ( HEXANE MEDIA ) ,, I M USING ROSEMOUNT 2051 DPT FOR LEVEL APPLICATION .. ITS CALIBRATE RANGE IS.. . 0 TO 950 MMH20 ..I DID CALIBRATED DPT WITHOUT REMOVING IMPULSE LINE OF HIGH AND LOW TAPPING.. & WITHOUT DISTURB 3 WAY MANIFOLD..!!! BUT ,,, DURING CALIBRATION I SELECT RANGE BY HART LRV IS 900 MMH20 & URV IS 1300 MMH20 ,, BUT ,TANK LEVEL SOMETIMES 100 % AT 1100 MMH20 , SOMETIMES 1300 MMH20 ..IN THIS CONDITION .. WHOLE LOOP FAILED ,, MAIN THING IS THAT ,, HOW TO CUSTOME RANGE SELECT ?? AND IF I USED RANGE OVER THE ORIGINAL CALIBRATE RANGE ,,,THEN WHAT ERROR WILL BE COME ??? HOW TO ZERO CALIBRATION OF DPT... HOW TO ZERO TRIM BY MANIFOLD ?? AND FOR TANK LEVEL PURPOSE ... WHICH UNIT I CAN USE ??? IS THERE ANY CALCULATION OR CALIBRATION .. IF YEH .. THEN PLZ JUST GIVE ME CALIBRATION STEPS FOR DPT.. THANKS YOURSSSSSSS

1 Answers   Torrent Pharma,


Hello-I know this not an engineering question,I am working in gulf & i want to do correspondence diploma in instrumentation,can any one give me the address of any university in which this courses are available.

2 Answers  


what is instrument termination

1 Answers  


-200mmwc to 500mmwc range transmitter have there 4mA is -200 and 20mA is 500.what is the range in 12mA?

5 Answers   NCC,


why flow transmitter showing 2.2ma?

2 Answers  


What is the difference between sdv and bdv ?

1 Answers  


how to calculate the temp. of RTD&Thermocouple when we got some mV r Ohms?if anybody has d chart pls mail the chatrs to me...

1 Answers  


What is transducer

4 Answers   IFFCO, Jindal,


i install a DP transmitter of Faugi on drum level of boiler but i face a problem in it when i engergize the transmitter the meter shows 0 or 100% no variation in it.the distance of two points is 19.5 inches, i am in trouble please suggest me what can i do it's very urgent Please reply me as soon as possible Best regards ikraam haider

5 Answers  


what is Pre- commissioning.

5 Answers   Saipem, Takreer,


If I want to buy a pressure switch & 3-way valve for hot water application then witch parameter I should consider.

1 Answers  


What is furnace draft control?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4454)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)